How we know the change helped.

Before delivery we set the measured baseline and the indicators we will use to assess the benefit. The number of automations or trained people alone does not explain the result of a project.

What we track.

We choose indicators to fit the process and the goal of the change.

Speed
total processing and waiting time
Team workload
time needed per case and volume of work handled
Quality
error rates, corrections and exceptions
Costs
process costs including licences, operation and support
Use
how many real cases go through the new process
Decision-making
timeliness of information and accuracy of estimates

A number needs an explanation.

For each published result we state the source, period, sample size and method of comparison. We account for changes in workload and conditions. We separate freed-up capacity from actual cost reductions.

Data source
Records from the systems, not an impression from a meeting.
Period
A comparable period before and after the change.
Sample
How many cases the measurement covered.
Comparison
Against the measured baseline, not an estimate.

We publish references after the client approves them.

A case describes the starting situation, the change made, how people were involved and the documented result.

A case study includes

  • context and the original problem
  • scope of work and period
  • how people were involved
  • result and how it was measured
  • limitations
We don’t count automations. We measure the operating result.

What could be measured in your company?

The introductory call takes 30 minutes. We set the baseline and indicators for a selected process.

Strategic workshop