Prepare quotes and site records with less admin.
We connect the brief, cost data, communication and site records. Estimators, planners and site managers have the information they need to decide.
An initial 30 minutes on your specific situation.
A possible approach. We verify the specific steps, connections and permissions for your company. The example does not use your data. Everything on this page is a proposal, not a description of a running deployment. What already runs for clients is described on the Agentic system page.
Quotes depend on manual assembly.
- The quote is put together by hand in Excel.
- The bill of quantities is retyped from the project.
- The site manager writes records up in the evening from memory.
- An unrecorded change easily goes uninvoiced.

Model comparison.
A model example, not the result of a specific deployment.
What the solution can take on.
Quote inputs
Prepares quote inputs from verified sources. You set the price.
Subcontract comparison
Brings subcontractor offers into a comparable form.
Site record
Assembles a draft record from data and photos. The site manager checks it.
Changes and invoicing
Links approved changes to the invoicing records.
What we verify: project data format, completeness of quantities, approval rules and required contents of outputs. Photos alone do not replace a complete site record.
What we measure: preparation time, corrections and completeness of records.
How we proceed.
Initial conversation
30 minutes on your specific situation and priorities.
Strategic workshop
Three hours with leadership. We map where quotes and diaries stall.
What you ask us.
Do we have to change our system?
How much does it cost?
When can the first part be ready?
How do we start?
Where does manual work take most of your time?
We go through your situation, the main obstacles and the information available. Together we decide whether a workshop, a review of a specific process or another next step makes sense.